Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractors bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.

5/1/2023 bid opening - Olympia, WA

Item no. 1: 2024 OR Region Wide Chip Seal

Contract number: XE3531
Engineer's estimate: $4,541,073.80
Number of addenda: 0
Number of bidders: 3/2
Award status: pending

Preliminary bid total results

Apparent low: Doolittle Construction, LLC - $5,279,476.50
Apparent second: Granite Construction Company - $6,278,759.31

Verified bid total results

Low bidder: Doolittle Construction, LLC
Bid amount: $5,279,476.50

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Hi Grade Asphalt & Seal Coat, Inc. - sub - $600,000.00
    Description of work: pave repair excavation incl. haul; placing HMA for preleveling; placing HMA for pave repair
  2. T&T Traffic Control, LLC - sub - $420,000.00
    Description of work: traffic control (excluding class A signs) - partial

DBE goal: $1,003,100.54
DBE total: $1,020,000.00

Second bidder: Granite Construction Company
Bid amount: $6,278,759.31

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Budiman Construction - sub - $641,832.85
    Description of work: traffic control
  2. Hi Grade Asphalt & Seal Coat, Inc. - $609,000.00
    Description of work: asphalt paving, asphalt repair, and asphalt grinding

DBE goal: $1,192,964.27
DBE total: $1,250,832.85

Item no. 2: SR 24 et al, SCR 2024 Region Wide Chip Seal and Rumble Strips

Contract number: XE3530
Engineer's estimate: $3,821,583.25
Number of addenda: 1
Number of bidders: 4/3
Award status: pending

Preliminary bid total results

Apparent low: Interstate Concrete & Asphalt Company - $3,968,734.30
Apparent second: Granite Construction Company - $4,040,400.00
Apparent third: Central Washington Asphalt, Inc. - $4,388,000.00

Verified bid total results

Low bidder: Interstate Concrete & Asphalt Company
Bid amount: $3,968,734.30

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises 1, Inc. - sub - $756,198.00
    Description of work: traffic control, rumble strips, RPMs, temporary striping
  2. Pacific Rim Service and Construction Co., Inc. - sub - $0
    Description of work: guardrail construction, guidepost installation
  3. KB Markings, LLC - sub - $0
    Description of work: painting lines on highway

DBE goal: $595,310.15
DBE total: $756,198.00

Second bidder: Granite Construction Company
Bid amount: $4,040,400.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises 1, Inc. - sub - $610,000.00
    Description of work: traffic control, temp & recessed pavement marking, rumble strips 

DBE goal: $606,060‬.00
DBE total: $610,000.00

Third bidder: Central Washington Asphalt, Inc.
Bid amount: $4,388,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $700,310.00
    Description of work: flagging, traffic control, recessed pavement marking, rumble strips, sign erection, sweeping

DBE goal: $658,200‬.00
DBE total: $700,310.00

 

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

Slow down – lives are on the line. 

In 2023, speeding continued to be a top reason for work zone crashes.

Even one life lost is too many.

Fatal work zone crashes doubled in 2023 - Washington had 10 fatal work zone crashes on state roads.

It's in EVERYONE’S best interest.

95% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.